Tag: Completed Projects

  • TOTEM T2

    TOTEM T2

    Explore →

  • CMS Preshower

    CMS Preshower

    Explore →

  • Magnet Controls

    Magnet Controls

    Explore →

  • LHCb RICH HPD

    LHCb RICH HPD

    Explore →

  • GAS Systems

    GAS Systems ALICE ATLAS CMS LHCb TOTEM TPC TRT Xenon system DT OT IT TRD TRT Forward CO2 cooling CSC MWPC T2 TOF MDT RPC RICH1 PMD RPC ID N2 purge facility RICH2 CPV TGC Muon Trigger CSC Muon Tracker ID purge facility CSC LUCID

    Explore →

  • CMS Tracker (TOB)

    CMS Tracker (TOB)

    Explore →

  • CMS ECAL Endcap

    CMS ECAL Endcap

    Explore →

  • ATLAS TRT/IT

    ATLAS TRT/IT ATLAS end-caps on the move Installation of ATLAS Inner Detector EndCap C ATLAS Inner Detector End-Cap ATLAS Inner Detector End-Cap A SCT and TRT detectors The first Inner Detector End-Cap is lowered into the cavern Final Assembly of ATLAS SCT EndCap into TRT EndCap Inner Detector installation of ATLAS SCT and TRT barrel

    Explore →

  • ALICE HMPID

    ALICE HMPID

    Explore →

  • ALICE TPC Field Cage

    ALICE TPC Field Cage

    Explore →